L&T Wins NVIDIA B300 Order for Chennai AI Factory
By Ganesh Karki
Key facts
- Section
- Tech & AI
- Country
- India
- Published
- 24 Nov 2026
Vyoma.AI, a Larsen & Toubro group company, has won a multi-year order for NVIDIA B300 GPUs — worth between Rs 2,500 crore and Rs 5,000 crore — to deploy more GPUs at its Chennai datacentre. L&T disclosed the order to the stock exchanges on 23 November 2026.
| Order | A multi-year engagement covering extra NVIDIA B300 GPUs |
| Value | Between Rs 2,500 crore and Rs 5,000 crore — inside L&T's "Large" band |
| Client | An inference infrastructure provider, whose name has not been disclosed |
| Site | The Vyoma.AI data centre campus in Chennai |
| Cluster | Forms part of the campus's 10,000-GPU cluster |
| Commissioning target | The Chennai AI Factory is due to be commissioned in January 2027 |
What happened
Through its AI infrastructure arm, LTN Compute, Vyoma.AI has taken on a large order from an inference infrastructure provider for additional NVIDIA B300 GPUs at its Chennai datacentre. Those GPUs will power the client's AI-native platform, letting it train, fine-tune and deploy AI models for high-performance inference at commercial scale. L&T have put the order in their 'Large' bracket — orders worth between Rs 2,500 crore and Rs 5,000 crore — and have disclosed neither the exact value, nor the number of GPUs, the tenor or the customer's name.
This builds on L&T's move into the AI factory business. Back in August 2026, LTN Compute landed a "Mega" order to host a 10,000-GPU NVIDIA B300 AI Factory for Together AI of the US at the same campus — L&T billed it as India's biggest single-cluster AI infrastructure. Then in October, Vyoma.AI started work on a 52 MW AI-ready data centre in Chennai, beside its existing 30 MW facility. At the Q2 FY27 earnings call on 27 October, L&T put January 2027 as the target for commissioning the Chennai AI Factory. The campus is meant to grow into a gigawatt-scale AI hub, with Phase 1 built for 250 MW and 150 MVA of power infrastructure already in place.
What the NVIDIA B300 order means
India-hosted inference capacity is fast becoming a market in its own right, and this deal is the latest sign of it. Domestic players are adding GPU capacity at speed — Neysa recently switched on an 8,192-GPU AMD cluster in Mumbai, Sarvam's Token Factory opened India-hosted AI inference to developers, and the IndiaAI Mission's 10,000-GPU tender is adding subsidised compute. For enterprise buyers, more NVIDIA B300 capacity on Indian soil means more ways to run large models close to their data, with lower latency and simpler data-residency compliance.
It also shows, very clearly, how the AI chip race has moved beyond selling chips to selling whole factories. An integrated AI factory bundles hyperscale data centre infrastructure with accelerated computing, high-performance networking, ultra-low-latency interconnects, high-throughput parallel storage and AI infrastructure operations. That is exactly the same rack-scale shift behind our coverage of the Nvidia Rubin HPC chip, where buyers now purchase the rack rather than the chip. More on the wider picture in our Tech news section.
What the sources do not say
L&T have named neither the client nor the exact value of the order, the number of NVIDIA B300 GPUs it covers, or the length of the engagement. Nor have they said when the new GPUs will be installed or switched on — only that the wider AI factory is due for commissioning in January 2027. And the press release says nothing about how the capacity is split between training and inference workloads.
Sources: Elets CIO reported the order details, cluster size and campus plans; CNBC TV18 covered the stock exchange disclosure and the order band; Upstox carried the press release wording and the chairman's statement.
Frequently asked questions
Who's the client on L's new NVIDIA B300 order?
What's the size of the order?
Sources and references
Information checked: 24 November 2026
Related stories
Nvidia brings back Jensen Huang as CEO after board reversal
Nvidia's board has unanimously reinstated Jensen Huang as chief executive, 11 days after he resigned — and shares jumped 31% on Monday.
24 November 2026Tesla AI5 Chip Goes to Optimus as Cars Stay on AI4
Musk says the Tesla AI5 chip will power the Optimus robot while Tesla cars stay on AI4, which he calls enough for driving safer than a human.
24 November 2026Samsung Googlebook Origin Leak Points to 14 and 16 Inch Models
Samsung Googlebook laptops codenamed Origin 14 and Origin 16 have surfaced in One UI 9.5 beta code, pointing to 14-inch and 16-inch models.
24 November 2026OpenAI Dots Agent Expands to ChatGPT Plus Test
The OpenAI Dots agent is being tested with a small group of ChatGPT Plus users and rolled out to all ChatGPT Business Standard accounts.